Client: Baton Rouge Metropolitan Airport
Scope: Spalling and failed concrete were identified along Runway 4-22. Hendrick Construction’s FAA team installed closures to the affected runway, including low-profile barricades, lighted closure x’s and issued NOTAMs to the tower to remove and replace the affected panels and re-open the runway with minimal downtime for air traffic.