- Client: Ascension-St. James Airport & Transportation Authority Scope: New construction of a 12,300 SY Taxiway and Apron, including base, pavement, striping and lighting
- Client: Baton Rouge Metropolitan Airport Scope: Spalling and failed concrete were identified along Runway 4-22. Hendrick Construction’s FAA team installed closures to the affected runway, including […]
- Client: St. Landry Parish Airport Scope: Demolition and reconstruction of failing taxiways, upgraded lighting and electrical system, with re-striping of taxiway C, E and runway 18-36
- Client: Baton Rouge Metropolitan Airport Scope: Demolition of existing roadways to extend the airport’s footprint and construct a new taxiway, including base, pavement, striping and lighting
- Client: Feliciana Airpark Scope: Full-depth reclamation of the existing runway and base with new asphalt paving and striping
- Client: Hammond Northshore Regional Airport Scope: Rehabilitation of Runway 18-36, including full-depth demolition of the existing runway, installation of new base, pavement, striping and lighting






