Hendrick Construction
✕
  • About Us
    • Who We Are
    • Our Commitment to Safety
  • Services
  • Past Projects
  • Contact Us
  • About Us
    • Who We Are
    • Our Commitment to Safety
  • Services
  • Past Projects
  • Contact Us

Past Projects

  • Ascension-St. James Airport & Transportation Authority, LA Regional Airport Expansion
    LA Regional Airport Expansion
    Client: Ascension-St. James Airport & Transportation Authority Scope: New construction of a 12,300 SY Taxiway and Apron, including base, pavement, striping and lighting
  • Formosa Plastics, Formosa Rail Scale
    Formosa Plastics Rail Scale
    Client: Formosa Plastics Scope: Installation of sheet pile along existing rail and timber pile foundations for the new scale
  • Louisiana Department of Transportation, H.003047 Pecue Lane/I-10 Interchange Phase III
    H.003047 Pecue Lane/I-10 Interchange Phase III
    Client: Louisiana Department of Transportation Scope: Installation of drilled shaft foundations
  • Louisiana Department of Transportation, H.013482 I-10 WBR Queue Warning System
    H.013482 I-10 WBR Queue Warning System
    Client: Louisiana Department of Transportation Scope: Installation of drilled shaft foundations along I-10
  • Baton Rouge Metropolitan Airport, Runway 4R-22L Emergency Repair
    Runway 4R-22L Emergency Repair
    Client: Baton Rouge Metropolitan Airport Scope: Spalling and failed concrete were identified along Runway 4-22. Hendrick Construction’s FAA team installed closures to the affected runway, including […]
  • Louisiana Department of Transportation, H.008170 LA 1024 Creek Bridge Replacement
    H.008170 LA 1024 Creek Bridge Replacement
    Client: Louisiana Department of Transportation Scope: Replacement of 2 failing span bridges along LA 1024
  • Louisiana Department of Transportation, H.013260 I-55 US 190 Slope Repair
    H.013260 I-55 US 190 Slope Repair
    Client: Louisiana Department of Transportation Scope: Emergency repair of failing Sub-base along Interstate 55, including undercutting failing areas, embankment and installation of 600 LF of 15’ […]
  • The Port of Greater Baton Rouge, Inland Rivers Marine Terminal Container Yard Expansion
    Inland Rivers Marine Terminal Container Yard Expansion
    Client: The Port of Greater Baton Rouge Scope: Construction of 17,622 SY 16” concrete container yard, including lime-treated subgrade, 610 limestone base and lighting upgrades with […]
  • West Baton Rouge Parish Government, Sid Richardson Road
    Sid Richardson Road
    Client: West Baton Rouge Parish Government Scope: Installation of 8’x8’ and 6’x6’ box culverts at existing canal crossings and construction of 3,775 LF of roadway
  • Louisiana State University, Roadway Improvements at Innovation Park
    Roadway Improvements at Innovation Park
    Client: Louisiana State University Scope: Installation of new concrete roadway connecting Nicholson Extension to GSRI Drive
  • Louisiana Department of Transportation, H.006457 Roundabout @ PR 929 & Parker Roads
    H.006457 Roundabout @ PR 929 & Parker Roads
    Client: Louisiana Department of Transportation Scope: Demolition of existing intersection at Parker Road and PR 929 to construct new roundabout
  • St. Landry Parish Airport, 2024 Airport Improvements
    2024 St. Landry Parish Airport Improvements
    Client: St. Landry Parish Airport Scope: Demolition and reconstruction of failing taxiways, upgraded lighting and electrical system, with re-striping of taxiway C, E and runway 18-36
  • Baton Rouge Metropolitan Airport, NW Aviation Taxiway Development
    NW Aviation Taxiway Development
    Client: Baton Rouge Metropolitan Airport Scope: Demolition of existing roadways to extend the airport’s footprint and construct a new taxiway, including base, pavement, striping and lighting
  • Feliciana Airpark, Runway 15-33 Rehabilitation
    Runway 15-33 Rehabilitation
    Client: Feliciana Airpark Scope: Full-depth reclamation of the existing runway and base with new asphalt paving and striping  
  • Hammond Northshore Regional Airport, Runway 18-36 Rehabilitation
    Runway 18-36 Rehabilitation
    Client: Hammond Northshore Regional Airport Scope: Rehabilitation of Runway 18-36, including full-depth demolition of the existing runway, installation of new base, pavement, striping and lighting
Hendrick Construction
  • Who We Are
  • Our Commitment to Safety
  • Services
  • Past Projects
  • Contact Us

© 2026 Hendrick Construction | Website by JCW Creative

Privacy Policy | Terms and Conditions